(A “conca” was a navigation lock inside the Navigli - Milan canal system - and it was named after the use of paying the local duties - called “gabelle” – there)
L’intervento ha avuto come oggetto il restauro e risanamento conservativo di Villa Scheibler...
The crypt of the Church of San Primo was found behind the State Archives of Milan revealing a complex and fascinating burial system.
The restoration work carried out on the exterior surfaces of the Church of St. Mary “alla Fontana”, anticipating the restoration of the decorative surfaces of the interior, aimed at the safety of the building.
Rising moisture and the consequent salt efflorescence that pulverize the color is the main cause of degradation of the structure. The result of the chemical-physical analysis carried out, lead us to the knowledge of a series of maintenance works carried out with the use of heterogeneous materials mostly of protein nature such as the albumen, glues of animal origin and fatty substances in order to consolidate the color and enhance color tones.
The first phase of the restoration of the church of St. Maria Podone ended together with the former parsonage, both located in the central Piazza Borromeo,ended in the summer of 2005.
The construction of the Church of San Fedele began in 1569, following Pellegrini’s design and continued under the direction of Martino Bassi first and then of Francesco Maria Ricchino. The building has a single nave divided into two spans with vaulted cup resting on giant columns.
The project - which required a great analytical effort - is limited to operations able to ensure longer life to what we have so far. The central idea of the project is not limited therefore to stop the deterioration that inevitably occurs, but it intends to delay new unavoidable interventions.
In 2002, the Commissioner for Architectural and Landscape Heritage of Milan, began the restoration of the rooms on the first floor of Cascina Monastero of Santa Maria at Baggio, currently the headquarters of the Area #7 of the Municipality of Milan. The aim was to prevent the loss of the decorations retained therein.
Presso la sede storica del Piccolo Teatro di Milano sita in via Rovello è in restauro il chiostro minore di un edificio rinascimentale...
Since the beginning the restoration of the former church of San Pietro dei Pellegrini was quite complicated and required time for studying and pauses for reflection, which stretched the duration of the works.
The apse of the cathedral showed some minor issues relating to a continuous although modest lead unsealing eastward. Moreover, the large upper falconature (summit decorations) were cracked in the area of contact with the chains, and all the marble surface was particularly affected especially in the most exposed portions such as sculptures and ornaments.
Taking into consideration that the façade of the Oratory of Saint Mary of the Passion is a modern work of Arch. Adolfo Zacchi, at the time architect of the Venerable factory of the Duomo Cathedral, who, while working on it, also closed three doors placed in the end of the wall between the door and the large window top, we tried to understand - from what we could see - the story of the evolution of this small place worship.
Reconnection of Conca di Viarenna to the Darsena (the old Milan harbour): first re-opening of the hidden Navigli.
During execution of the works, different changes became necessary with respect to manufacturing procedures for the different areas of intervention. In addition to some differences detected between actual quantities and expected ones, the main differences involved the procedures carried out for the cleaning of the bricks, for the fixing of the small marble columns, for grouting and protection of the stone base of the bell tower and for the creation of a green area at the entrance of the Church.
The architectural complex is the evidence of the conflict evolution of humanistic and architectural thought in Milan along the '400. You can see, as a matter of fact, both the presence of Solari’s architectural thinking, still strongly influenced by the Romanesque-Gothic style, and Bramante’s turning point, particularly developed in the well-known solution of the apse. The complex has undergone major restoration interventions since the end of '800, with emblematic solutions suggested by Beltrami.
Preservation and restoration works on roofs and façades, including rising damp removal, started in 1998, giving priority to areas showing serious problems caused by infiltration of rainwater and rising damp (transepts, apse, northern roofs).
Il monumentale complesso della Cà Granda, seppur frutto di una storia costruttiva che...
Dated back to early Middle Ages, Sant'Eustorgio is the result of various important historical stratifications. We would like to mention here the restoration works carried out in recent years on the parts built between '400 and '500, which, besides the impressive size of the Romanesque Church, characterize the entire building. The most evident and best known element of this historical period is the Portinari Chapel, the first example in Milan where the language of the Renaissance, of Tuscan origin, confront itself with the Romanesque-Gothic style.
L’Amministrazione comunale intende valorizzare il complesso castellano in vista di Expo 2015, migliorando la distribuzione e gli allestimenti...
L’intervento prevedeva il consolidamento conservativo della muratura e l’eliminazione dell’umidità sui muri interni e quelli perimetrali...
Nel 1997 l’Annunciat, antico e glorioso complesso conventuale quattrocentesco...
The interventions of upgrading and restoration of the buildings known as “Cascine Chiesa Rossa” (Farms of the Red Church) were characterized by a general recovery of the walls carried out on each pillar and wall (about 80%) through the recovery of the joints - scarified and sealed with appropriate hydrated lime mortar - as well as the plumbing of the off-axis pillars with arrangement of the masonry.
Given that the life of a cultural object is closely influenced by the environmental conditions of the context in which it lies (shading, orientation, etc..), and that this artifact materials and shape are characterized by porosity and water absorption, currently, at the end of intervention, it is yet to define future maintenance and the possible limits of acceptance and coexistence between the green and the walls, with the knowledge that it is unthinkable to oppose to the biological cycle of re-growth, but being forced to take care of these remains of the defensive system of the sixteenth century citizen, or suffer their loss.
The first project for renovation and restoration of the architectural complex was prepared in 1983. Since dealing with a single long contract for the whole duration of the works was too demanding for the Municipality Administration, the operations were divided into four lots.
The new demands of the University of Milan entailed the recovery interventions of the area below the lower cloisters of Filerete buildings: the "Icebox", the "Woodshed" and "Eighteenth Century."
The works for the courtyard made by Richini at Cà Granda were started in the fifteenth century and completed by architect Francesco Maria Richini in the seventeenth century. The massive use of Angera stone, with high porosity, caused a sharp deterioration of the sculptural elements, exacerbated by wartime destruction and by environmental pollution caused by sulfur compounds. The first restoration (1990-1994) involved a vast operation of desalination, removal of cement, grouting and consolidation.
The restoration of the fifteenth century "Icebox" courtyard, former Cà Granda Hospital, mainly involved interventions on the surfaces of the north-western and south-western sides, and on the stone elements of the remaining two sides, characterized by an evident state of degradation of the surfaces, consisting especially of terracotta, stone, and plaster elements.
Pigello Portinari, who managed the Medici Banco (Bank) in Milan, built the chapel in an elegant Renaissance style for the custody of the relics of the head of S. Pietro Martire, and was buried there in 1468.
The stratigraphic evaluations, carried out on the vaults of the Chapter House, allowed to detect the presence of a homogeneous plaster, under layers of lighter plasters that were applied over the centuries, depending on the different functions performed by the House.
Restoration works were carried out in parallel with the set-up of the Diocesan Museum (whose design has been repeatedly modified), where designers have been working with a committee of the Archbishopric of Milan.
The restoration of the exteriors of the southern wing of Sant'Eustorgio’s Cathedral were carried out in two different phases: the first, thanks to the contributions of Cariplo foundation, sponsored the interventions in the four chapels dating back to the XIII-XIV, whereas the second one, thanks to Government funds, involved the southern transept and the mediaval apse.
L’intervento di risanamento e restauro conservativo è stato caratterizzato da...
The interventions involved the restoration and upgrading of the Cascine Chiesa Rossa area, and, in particular, the recovery of the cloister consisting of a colonnade with tile roof.
The buildings known as Cascine Chiesa Rossa (Farms of the Red Church) include five buildings: the Church, the Parsonage, the Cloister, the former Stable - now Library - and the former House, in addition to a large public park.
The restoration of the exteriors of the church were preceded by evaluations aiming to identify the origin of the degradation both on the external walls and, sporadically, on the vaults and on the perimeter walls of the lateral chapels and of the transept.
It is important to note that almost all the original plasterwork of the lantern was preserved: in the most sheltered areas even the paint film was in a good condition, whereas in other places the painted surface was missing, but the finishing was preserved.
Il restauro della pittura murale rinascimentale raffigurante Cristo in croce ha previsto le...
Interventions involved the figures of four Dominican Saints by Bernardino Butinone, on the left wing of the Church of St. Maria delle Grazie in Milan: since the beginning it was clear that the different restoration works stratified on these ancient paintings (1482-1485) over the years, partially hidden and concealed, and partiallyly modified, had to be identified.
Between 2002 and 2005, the Commission for Architectural Heritage and Landscape of Milan, funded by the Ministry of Heritage and Cultural Activity,after many surveys carried out on the external surfaces of the podium (tribuna) of St. Maria delle Grazie aiming to assess the state of conservation of materials and the corresponding causes of degradation, decided a series of interventions for preventing or at least delaying the risk of loss of the decorations.
Between the presbytery area of the Podium of Santa Maria delle Grazie, and Bramante’s cloiser, there is a room , conventionally called "Room of the bell tower," as it communicates with the base of the bell tower.
The church consists of three buildings of different ages: a rectangular apse supposed to be built in the XII-XIII century to which the sacristy and the Ducal Chapel - dedicated to St Giacomo, Cristoforo and Cristina - were added at the beginning of XV century, and a charnel house built behind the octagonal sacristy in the first half of the seventeenth century.
The great ruin defending the entrance of the castle curtain of Santo Spirito, towards Cadorna area, can become the new access to the various levels of the castle, to the floor of the courtyard of Arms, or to the Covered Road of Ghirlanda or the one of the Merlate (castellated walls).
The historical area of St. Maria at San Satiro includes the high medieval tower called dell'Ansperto, the Byzantine Sacellum of San Satiro, the Baptistery and the Cathedral of St. Maria.
L’uso per secoli dei locali a scuderie ha determinato una ritenzione di Sali ed...
Following an upgrading of the installation system, the floor and the complete wall decoration of the former Spanish infirmary - built in 1576 for the shelter of the castle residents infected by plague – were discovered.
The lack of copper strips closing the layers, the absence of sheaths or undulated undertiles, underground traffic conditions that disconnected the mantle, allowed infiltration and washouts in the façade.
The covered road of Ghirlanda, also called the "Ghirlanda Gallery," is an underground path consisting of a vaulted tunnel parallel to the outer part of the counterscarp of the ditch: it became the first defense of the Sforza Castle rectangle.
I lavori iniziano con una radicale sistemazione della copertura nel febbraio 2005, e...
The enhancement operations that on several occasions in recent years affected not only the old convent building but also some artworks inside, undoubtedly contributed to the appreciation of this important monastery.
The restoration of the façades of the eastern and northern fronts of the ancient monastery initially included only the removal of cement parts in the lower band, retaining all the remaining plaster by means of re-adhesion procedures using a combined system of cleaning and consolidation, including final sealing and protection.
Identified by some sources as the probable Chapter House of the monastery, or even the original place used by the noble Tanzi as his private chapel, the "Hall of the Column" is certainly one of the most important rooms of the ancient monastery.
The church dedicated to the Saints Faustino and Giovita - better known as the Shrine of the Madonna delle Grazie - is currently undergoing a major conservative restoration affecting the entire interior environment.
The complex restoration and preservation works of the church of San Bernardino alle Monache in Milano (fifteenth century) has been completed. The interventions involved all the internal and external surfaces of the historical building and ended with the vaults surfaces of the nave.
Il restauro della Biblioteca della S. Maria Incoronata ha seguito questo iter lavorativo: il primo intervento interessò...
Since widespread infiltration of rainwater from roofs and damp due to faulty drainage put at risk the preservation of important artworks hosted in the Church, operations involving recovery of roofs and arrangement of the metal components preceded the restoration of the exterior walls and of the decorations of the fourth chapel on the right.
La copertura è costituita da manto di coppi posati, in doppio strato, direttamente sulla...
The conservative restoration affected different elements of the church and of the bell tower. Interventions were carried out using different techniques, on the basis of the different type of material: cotto tile vestments, plasters, stone elements (marble, ceppo gentile, Baveno pink granite), wooden and iron elements.
The surface had suffered extensive loss of paint film due to infiltration of water also responsible for the formation of salts. Lifted from the support and pulverized in some parts, it did not appear as cohesive; plasters were also detached from the wall in several areas. The intervention was limited to the removal of salts on the surface to stop degradation.
The project is part of the additional restoration and consolidation of the Spanish Walls, sections between Viale Caldara, Piazza Medaglie d’Oro, Viale Filippetti and Viale Beatrice d'Este in Milan - 2006-2009.
Restoration works started in 1997 and were accelerated in 2003, thanks to the initiative of the Municipality of Abbiategrasso, of the Lombardy Region and of The University of Milan. The restoration brought to light a large part of the original spaces.
The restoration works that, since 1996, have affected the Abbey of St. Maria dell' Annunziata were carried out in batches, thanks to regional government funding and loans in different phases. The initial funding allowed a deep study the Monastery with a first urgent intervention for the recovery of the roof structure between 1997-1998. In a second phase the recovery of the loggia near the southern wing, and dehumidification procedures of the painted walls were completed.
The church was built in 1552 by architect Domenico Giunti. The best artists of the time contributed to its realization. A crypt which has not been used for nearly two centuries is located beneath the main altar. In 1700, according to histories, during the period of Lent, it was used to celebrate Mass. The investigations carried out on the surfaces showed layers of great historical importance.
The project involved the consolidation and full reconditioning of the architectural and interior spaces in order to add new features to give back to society a monument in all its vitality and its original architectural spaces, eliminating all superfluous interventions made during nineteenth and twentieth centuries.
The project involved the completion of the recovery of the Visconti Castle, with the arrangement of spaces in the basements, of the courtyard and of the fourteenth-century arches, facing also the unresolved problem represented by the relationship between the building and the outside areas.
The hydraulic hub at Paullo and its relevant protection building, which was once called the "Lavorerio" or “Casa Camerale” and nowdays called “House of Water”, has always been a place of great historical, strategic and topical importance in the territory of the Consortium Muzza Bassa Lodigiana
Il Monastero di S. Lorenzo sorge nel centro storico di Vimercate nella zona immediatamente...
The rooms covered by restoration are included in the main wing of a large architectural complex, the so-called "Villa's House" in San Pietro all’Olmo di Cornaredo (MI), originally, and up to 1542, an Augustinian monastery.
Gli interventi realizzati sulle murature hanno previsto il consolidamento conservativo della muratura...
The restoration works that took place from 2004 to 2009 were rather problematic due to the various changes made in the course of time on the different parts of the architectural complex. A first phase of investigation led to the discovery of some architectural and artistic elements that, sometimes, imposed design changes.
After the successful discovery of the church of San Biagio in 1977, that was saved after a decade-long neglect, the small church underwent an initial consolidation, carried out with Government funds in 1991, which stopped the severe degradation, and reopened the possibility of a new rededication and reopening, very much felt in the area.
The church of St. Vittore, belonging to the former Benedictine monastery abandoned in 1798 and transformed by Pollak into a villa, is still owned by the family Antona Traversi.
La Fondazione Gaiani ha promosso il progetto di restauro, coordina e gestisce...
The restoration works carried out by Anna Lucchini’s company was completed in 1999. The frescoes depicting the Crucifixion and the Annunciation showed signs of degradation including clear signs of rising damp which was visible on the walls of the chapel. The major damages - on the eastern wall with a representation of the Annunciation - were due to the opening of a window that connected the apartment of the parish priest on the first floor with the chapel.
The restoration efforts carried out affected the façades of the church and of the parish house and the pronaos of the church of San Martino in Carpiano.
The complete lack of radical conservative interventions during the years for the functional recovery of the building resulted in a significant degradation particularly affecting the wooden roof and its curved tiles due to infiltrations of rainwater.
The restoration works were carried out in two distinct phases: the crypt and the roofs. The restoration of the crypt proved to be quite complex because of the multiplicity of issues that have been addressed.
Recovery, reutilization and refurbishment of the first and second stable of the castle of Vigevano for the allocation of the International Museum of Footwear "P. Bertolini" and the Civic Art Gallery.
The Arengario , Monza's City Hall, has been built between the fourth and sixth decade of the 1200s, and shares significant structural and stylistic similarities with Milan's Broletto.
The project was carried out in several stages, namely:
- study of the building (evaluations, historical researches, diagnostic testing, direct observation)
- data processing
- definition of design criteria
- identification of interventions and description of the operating procedures.
The project involves the restoration of part of the old ceremonial rooms on the ground floor of the northern wing.
The project to restore the façades of the eastern wing of Medici castle in Melegnano, under the responsibility of the Province of Milan, welcomes the principles of conservation, and integrates the transmissibility of the architectural heritage thanks to a series of measures to arrest the process of decay limited to the degraded parts.
The project to restore the façades of the eastern wing of Medici castle in Melegnano, under the responsibility of the Province of Milan, welcomes the principles of conservation, and integrates the transmissibility of the architectural heritage thanks to a series of measures to arrest the process of decay limited to the degraded parts.
The restoration project of the central body of the castle, wanted by the City of Melegnano, shows three interesting aspects: a new loft in the Retirement Village hosted on the ground floor (replacing the municipal library expected in a first time), a new glass elevator, and a guided tour in the attic.
The monastic complex of the monastery looks mostly intact in its original structure, showing an uncommon feature: the complex spread out into four levels, with the presence of two working rooms for the monks, placed one on top of the other.
Restoration works and readjustment as place of worship involved part of an important Cluniac priory, built in 1100 on a devotion medieval chapel, and laid on the Roman fortifications, a military district along the Pandina way.
The sponsorship of the Lombardy Region in December 1993 allowed to proceed with the consolidation efforts required for reconstruction of static equilibrium of the complex of the Coenoby, and to put in place the essential works for the elimination of the accretions of recent times, with the aim of restoring the original spaces.
The project, funded by Regional Law 39/84, involved the restoration of the plaster of the open gallery and the south and west façades of the monastic coenoby which, over the centuries, underwent numerous transformations and rearrangements.
With the Program Agreement with the Region of Lombardy in October 2006, the launch of the completion of the restoration works of the dormitory finally took place.
The works carried out inside the stables belong mainly to two distinct areas: the surface treatment (cleaning, filling and aesthetic enjoyment), and works relating to the structural apparatus artefact.
The abbey church of Santa Maria di Morimondo was built between 1182 and 1296, according to the building modules and forms of Gothic Cistercian: latin cross shaped bases, apse rectangular profile; transept with central bay surmounted by an octagonal lantern; façade with arched windows , rose window and crown hanging arches, naves separated by columns and covered by ogival vaults. The elegant and simple Gothic structure was enriched over the centuries by some pictorial: among them you can see the wall paintings of the exterior walls of the choir, made around 1591, after the abbey church was converted into a parish.
The interventions entailed the static verification and the structural consolidation of the main wooden warping of the roof of the central nave of the abbey.
The interventions entailed the static verification and the structural consolidation of the main wooden warping of the roof of the central nave of the abbey, as well as the consolidation of the secondary structure of the wooden deck and stairs in the bell tower.
Within the area of the Abbey in Viboldone, in addition to the Abbey of Saints Pietro and Paolo (twelfth and fourteenth centuries) and the monastery built in the mid 60’s designed by the architect Luigi Caccia Dominioni, there is a building called the Ancient House or the House of the Prior.
The restoration involved the entire cathedral, including the church building and the bell tower completing interventions already begun in the 90s affecting however only the interiors and the adjacent chapel of Addolorata.
Le decorazioni che rivestono interamente i saloni al primo piano del Castello...
This church was completed in April 1511 by the painter Bernardino de Rossi (1484-1514), commissioned by the monks of Certosa (Monastery) of Pavia, and composed by iconographic elements affected by aesthetics of the Certosa itself.
L’intervento in oggetto è proposto nell’ambito del progetto finalizzato al consolidamento strutturale...
Thermohygrometric evaluations at the church of St. Alberto in Caselle di Morimondo (MI), commissioned by the Parish of St. Siro in Ozzero, began on July 6th, 2007. The purpose of these diagnostic tests was to measure the hygrothermal conditions of the walls, affected by degradation phenomena due to the water change of state from liquid to vapor and vice versa.
The thermohygrometric evaluations of the Church dell’Annunziata, commissioned by the Municipality of Abbiategrasso, began in November 2004. The purpose of these tests was to assess the hygrothermal conditions of the painted walls, affected by degradation caused by water change of state from liquid to vapor and vice versa.
A fresco ascribed to Bergognone entirely covered one of the walls, where six saints were inserted in a large loggia whose pillars in foreground supported the ribs of the lunettes in the vault. On the contrary, the original front wall was made with bricks and covered by closets.
The Visconti Castle is one of the "wonders" of Trezzo, and certainly the symbol of the town. It was built in 1300 for want of Bernabo Visconti, next to a rock which is said to be built by Queen Theodolinda.
Interventions were decided by the Municipality Administration of Trezzo sull'Adda before 2005 but started only at the end of 2011.
Starting from 2010, the Municipality Administration of Trezzo sull'Adda focused part of its efforts to secure and to restore the walls of the Visconti Castle. For this purpose, always in 2010, Trezzo Municipality together with the Adda Nord Park and about twenty local institutions joined the AREA INTEGRATED PROJECT (PIA) called "Passage on Adda - from Leonardo to Expo: sustainable circuits and itineraries beyond 2015”. This project was submitted for Government funding through POR (Regional Operational Programme) according to Lombardy region call for proposals FESR 2007-2013 ASSE IV.